Vico Office for Time

Trimble Vico’s time workflows are bring a revolutionary perspective to BIM; by combining the power of model-based estimating with the advanced Flowline methodology of planning, creating detailed and accurate schedules in Vico Office is easy and powerful.

The combination of the three modules within the Vico Office suite allows the planner to plan/review/implement their schedule within a seamless workflow.  No import or export is required to move from one module to the next and no manual linking needs to be done in order to connect the different planning phases.

Schedules in the system are quantitatively driven by the design and can be easily optimized with one of the most advanced (line of balance) methods available; results can immediately be reviewed via the 4D player and simulations are output for the construction site team.  When ready, Production Control is a field-worthy method of proactively managing the plan.